Spring Street Management Group
Built Different
Built Different is a daily podcast for developers, general contractors, and capital partners working in modular, volumetric, and off-site construction. No hype. No futurism. Just execution reality. Each episode breaks down what actually determines success or failure in factory-built projects: coordination gaps, design freeze timing, transportation risks, sequencing failures, financing mismatches, and the hidden costs no one models. This isn't a show about the promise of modular. It's about what happens when modules hit the jobsite—and what you need to get right before they do. Topics include:W...
¿Dónde escuchar?
Podcasts en la app Replaio Radio Muy prontoLos podcasts llegarán muy pronto a la app. Instálala ahora y sé el primero en descubrir una forma totalmente nueva de vivir los podcasts
Episodios
Episode 123: HITT Breaks Ground on NASA's $300M Johnson Space Center 16.11.2026 3:46
HITT Contracting, the eighth-largest U.S. contractor by revenue, broke ground on NASA's Applied Spaceflight Fabrication Facility (Building 70) at Johnson Space Center in Houston. The ~37,625-square-foot greenfield facility is the first phase of a larger engineering complex and part of a $300 million umbrella contract shared among seven firms. For contractors, capital partners, and industrial const...
Episode 122: Minnesota's First Modular Holiday Inn Express Opens 13.11.2026 3:22
RISE Modular has completed the Holiday Inn Express & Suites in Alexandria, Minnesota — the state's first modular Holiday Inn Express and the company's fourth modular hotel delivery. For developers, lenders, and capital partners evaluating modular for hospitality, this project adds a concrete data point to a still-thin reference pool for modular construction under major franchise flags. Key Tak...
Episode 121: Amazon's Mass Timber Logistics Prototype in Elkhart 11.11.2026 4:12
Amazon's D115 Net Zero Delivery Station in Elkhart, Indiana just earned ENR's 2026 Midwest Best Project award for Sustainability — and it's more than a trophy. The 171,000-square-foot facility, built by Graycor with design led by ZGF Architects, is recognized as the first large-scale owner-occupied mass timber logistics building in the U.S. and one of the first industrial developments pursuing Liv...
Episode 120: Voters Reject Data Centers Across 10 States 09.11.2026 3:44
Last Tuesday's election sent an unmistakable message to data center developers and the local governments that have been greenlighting their projects: the public is done absorbing the costs quietly. Voters approved data center prohibitions or moratoriums across 41 local ballot measures in 10 states, and newly elected governors in Georgia, Ohio, and Texas all ran on pledges to slow or halt data cent...
Episode 119: ATCO Expands Modular Manufacturing in Ontario 06.11.2026 3:38
ATCO Structures has officially opened its expanded modular manufacturing facility in Grimsby, Ontario, marking a significant fixed-asset commitment to Canada's modular construction capacity. The move signals a dual bet on housing demand and large-scale infrastructure — but key financial details remain undisclosed, leaving developers, lenders, and capital partners without the numbers needed to full...
Episode 118: By-Right Permitting: Modular's Entitlement Unlock 02.11.2026 5:22
Modular construction has largely solved the manufacturing problem — factory-built is faster and more cost-predictable than stick-built. But modular multifamily projects continue to stall at entitlements, often for as long as or longer than construction itself takes. In this episode, we examine the case for by-right permitting as the structural unlock modular developers aren't fully using — and why...
Episode 117: U of Maine's 3D Bio-Home Factory Goes Large 30.10.2026 5:09
The University of Maine's Advanced Structures and Composites Center is nearing completion on a nearly $82 million, 50,000-sq-ft mass timber facility in Orono — the most integrated large-scale 3D manufacturing test bed for biobased construction in the U.S. With a printer system running at 500 lbs/hour and a nine-home pilot already funded, the facility is attempting to close the distance between res...
Episode 116: An NFL Facility Built in Under 3 Months, Modular 28.10.2026 3:50
WillScot's Senior Director of Fleet Operations, Sven Louis, broke down how the company delivered a fully operational NFL facility in under three months using modular construction — detailing the sequencing, logistics infrastructure, and jobsite coordination required to hit a hard NFL-calendar deadline. For developers, GCs, and capital partners evaluating modular for time-sensitive commercial proje...
Episode 115: UC Riverside's $299.6M Prefab Housing Win 26.10.2026 4:39
The UC Riverside North District Phase 2 student housing project — a $299.6 million, 1,568-bed development delivered by McCarthy Building Companies — earned an ENR 2026 West Best Projects Award of Merit. Originally designed as a wood-framed structure, it was converted mid-development to a prefabricated, panelized cold-formed steel system. The result: two 8-story buildings completed in approximately...
Episode 114: Holtec's $2.1M Whistleblower Verdict and SMR Stakes 23.10.2026 4:28
A New Jersey jury awarded former Holtec International CFO Kevin O'Rourke $2.1 million on October 21 after finding the nuclear developer retaliated against him for refusing to upload a draft investment document — prepared for Holtec's current SMR construction partner, Hyundai Engineering & Construction — that he believed contained inaccurate financial representations. Holtec plans to appeal. Th...
Episode 113: Prefab Interiors and the Schedule Compression Play 21.10.2026 4:45
Interior construction is consistently the slowest, most change-sensitive phase of a building project — and the conventional recovery tools are running out of runway. With 45% of contractors already delaying projects due to labor shortages and custom lead times stretching months, the schedule compression case for prefabricated interior construction is getting harder to dismiss. This episode breaks...
Episode 112: Meta's $6.6B Research Credit Fight 19.10.2026 5:01
Congress is pressing Meta over $6.6 billion in federal research tax credits claimed from 2023 through 2025, questioning whether expenses tied to constructing and operating AI data centers legitimately qualify as technological experimentation under IRS rules. The dispute — now spanning a Senate Finance Committee inquiry, a bipartisan House letter to Treasury, and a separate IRS request — has direct...
Episode 111: Icon's $200M Series D and the Titan Machine 16.10.2026 4:15
Icon, the Austin-based large-scale 3D printing construction company, closed a $200M Series D co-led by Baillie Gifford and BlackRock. The raise funds production of Icon's new Titan printer — a $899,000 machine capable of printing structures up to 27 feet tall — and a new R&D facility in Austin. For developers, contractors, and capital partners evaluating construction automation, this round sig...
Episode 110: DPR's $230M Prefab Kaiser Permanente Build in Colorado 14.10.2026 3:41
DPR Construction broke ground on a $230 million Kaiser Permanente medical office facility in Westminster, Colorado — and the build is running prefabrication across structural steel, exterior facades, interior spaces, and MEP systems. For developers, contractors, and capital partners evaluating industrialized construction in complex program types, this project is a live stress test of what full-sta...
Episode 109: HUD Bets on Factory-Built Multifamily 12.10.2026 4:27
HUD has tapped the National Institute of Building Sciences (NIBS) and modular advisory firm MOD X to run a yearlong initiative addressing the persistent barriers blocking factory-built multifamily housing at scale. This week's episode breaks down what the initiative could actually change for developers, lenders, and manufacturers — and where the structural limits of a federal advisory effort still...
Episode 108: HUD's 7-Step Plan to Modernize Manufactured Housing Code 09.10.2026 4:45
HUD released its "Next Generation Manufactured Housing Action Plan" this week — a seven-step roadmap for rewriting the manufactured housing code to comply with the 21st Century ROAD to Housing Act. The chassis-free mandate is law, but manufacturers can't sell a single chassis-free home until HUD completes rulemaking across all seven steps. For developers, contractors, and capital partners evaluati...
Episode 107: Skanska's First Mass Timber Lab at Cold Spring Harbor 07.10.2026 5:03
Skanska is wrapping up the $28 million Artificial Intelligence and Quantitative Biology building at Cold Spring Harbor Laboratory in Laurel Hollow, N.Y. — the firm's first mass timber laboratory project. The three-story structure features glulam columns and beams with CLT floor decks, including an 80-ft CLT span claimed to be one of the longest in a lab and office building on the East Coast. For d...
Episode 106: TVA's First US Small Modular Reactor Permit 05.10.2026 4:35
The Nuclear Regulatory Commission issued TVA a construction permit on September 29 for a 300-MW GE Vernova Hitachi BWRX-300 small modular reactor at the Clinch River site near Oak Ridge, Tennessee — the first U.S. construction permit for this reactor design. But TVA's board has not made a final build commitment, no long-lead procurement has been authorized, and a previously cited 2032 commercial o...
Episode 104: Construction's Cybersecurity Blind Spot 30.09.2026 4:52
Turner Construction, Kiewit, and AECOM all reported unauthorized system access since July 2026 — and the Turner breach allegedly touched ITAR-protected military documents. For the Built Different audience, this isn't just a tech story: it's a liability, contract, and insurance story with direct implications for every GC, sub, and developer working on government-adjacent projects. The 2026 Traveler...
Episode 103: Mass Timber Cuts $2M From Western Washington U Build 28.09.2026 4:08
Mortenson's published case study on Kaiser Borsari Hall at Western Washington University offers one of the more detailed cost-and-schedule breakdowns to come out of a mass timber academic project. The $55 million, four-story building came in $2 million under budget and 25% faster than the original schedule — and the mechanisms behind both figures are directly applicable to developers and GCs evalu...
Episode 102: NJ Fines Data Center $1M Over 123 MW of Unpermitted Power 25.09.2026 4:37
New Jersey environmental regulators fined DataOne $1.07 million for operating 62 natural-gas generators — nearly 123 MW of unpermitted capacity — at its Vineland AI data center, marking the largest enforcement action the state has taken against a data center. The penalty puts a sharp spotlight on the permitting gap that exists when large-scale AI infrastructure projects need bridging power before...
Episode 101: CSA Z251: Canada's New Modular Design Standard 23.09.2026 4:04
CSA Group has published CSA Z251, Canada's first national standard establishing a common design framework for volumetric modular buildings. For developers, contractors, and capital partners operating in the Canadian market, the standard represents a meaningful step toward reducing cross-provincial inconsistency in design review, permitting, and financing underwriting — but adoption timelines and e...
Episode 100: BOXABL Hits Nasdaq via SPAC 21.09.2026 3:51
BOXABL Inc. (NASDAQ: BXBL) is now a publicly traded company following the completion of its SPAC merger, bringing factory-built modular housing into public markets for the first time under its own ticker. For developers, capital partners, and investors evaluating industrialized construction, the debut raises immediate questions about SPAC track records in the construction tech space, retail-heavy...
Episode 99: Intro Columbus Tops Out as Tallest Mass Timber Student 18.09.2026 3:35
The Intro Columbus student housing project near Ohio State University topped out as the tallest mass timber student housing building in the U.S. — 158 feet, 13 stories, 242,000 square feet — and did it 10 weeks ahead of schedule. For developers and contractors evaluating mass timber's real-world execution profile, this project's speed, sequencing, and cost dynamics offer concrete data points worth...
Episode 98: Sunbelt Modular's 4-Way Merger With Titan Group 16.09.2026 4:05
Sunbelt Modular has announced a simultaneous merger with four companies — Titan Modular Systems, Apollo Modular Systems, Spartan Cargo Trailers, and Atlas Lumber and Building Supply — creating a vertically integrated modular construction entity that spans manufacturing, logistics, and raw materials supply. For developers, GCs, and capital partners active in the Sunbelt region, this consolidation r...
Podcasts similares
Replaio no es editor de podcasts; los nombres de los programas, las portadas y el audio pertenecen a sus autores y se distribuyen a través de canales RSS públicos