www.enr.com
ENR Critical Path Podcast
ENR’s Critical Path Podcast delivers insights from leading industry experts and decision-makers about the latest construction industry innovations, issues and developments.
Não deixe de visitar o site do podcast e apoiar quem o produz: www.enr.com
Onde ouvir?
Podcasts no app Replaio Radio Em breveOs podcasts estão chegando ao app. Instale agora e seja o primeiro a descobrir um jeito totalmente novo de curtir podcasts
Episódios
ALICE’s René Morkos Brings Scheduling Full Circle 30.06.2025 32:46
From the inception of the critical path, to newer methods such as the line of balance, Founder and CEO of ALICE Technologies René Morkos brings a month-long series of scheduling discussions to a close with Jeff Yoders. Sponsored by: Revizto
Augmenta Co-Founder Frio Iorio Joins the Critical Path 18.06.2025 42:29
Francisco “Frio” Iorio discusses automating electrical system design with Augmenta and all things construction technology related with Aileen Cho and Jeff Yoders. Sponsored by: Document Crunch
Two Bridge “Acolytes” Discuss the Legacy of Jean Muller 02.06.2025 30:59
ENR Deputy Editor Aileen Cho chats with Jim Lockwood and Antonion Dinis about the iconic bridge engineer, including the centennial memorial of his birthday in France. Sponsored by: Document Crunch
Nitin Bhandari Talks Scheduling at ENR FutureTech 23.05.2025 20:43
Planera Co-Founder and CEO Nitin Bhandari catches up with Aileen Cho and Jeff Yoders at ENR’s FutureTech conference in San Francisco and talks all forms of scheduling, from the critical path to the line of balance. Sponsored by: Ace Electric
Aviv Leibovici Joins the ENR Line of Balance Podcast 14.05.2025 27:17
Buildots co-founder talks with Jeff Yoders about the scheduling platform’s new AI-powered tool to automate the line-of-balance scheduling method, replacing manual calculations and spreadsheets. Sponsored by: https://enerfab.com/
Robert Siegel on Designing Ports of Entry 28.04.2025 44:28
A seasoned architect teaches ENR Deputy Editor Aileen Cho a thing or two about what goes into building facilities at economic, cultural and national borders. Sponsored by: https://ineight.com/
Josh Rizzo on Promoting Mental Health in the Construction Industry 11.04.2025 48:26
ENR Editors Aileen Cho and Jeff Yoders talk to a military and construction veteran whose leadership in promoting worker physical safety has broadened to include mental health. Sponsored by: https://ineight.com/
Clay Paslay on Executive Program Management for Airports 26.03.2025 30:18
ENR Deputy Editor Aileen Cho talks to one of her former newsmakers about his special method of helping airports deliver big projects.
A Special “Red Carpet” Roving Podcast 13.03.2025 13:27
ENR Editors Aileen Cho and Jeff Yoders in 2024 chatted with attendees of the Best of the Best and Top 25 Newsmakers events, including newsmaker Robert Buckley (pictured). This year’s events are happening March 27!
Eric Reid and John Kovacs on Co-COO-ing 27.02.2025 45:12
A dynamic duo discusses how they copilot billions of dollars’ worth of projects for AECOM Tishman’s New York office.
Burcin Kaplanoglu’s AI-in-Construction Predictions for 2025 30.01.2025 43:42
Oracle Industry Lab Vice President of Innovation Burcin Kaplanoglu returns to the Critical Path to talk with Jeff Yoders about artificial intelligence and how it will change construction processes in 2025 and beyond. Robotics, drone technology and other construction tech make it into their conversation as well.
Terri Mestas on Preparing for a $54B Sound Transit Building Boom 13.01.2025 38:38
The deputy CEO for megaproject delivery chats with ENR Deputy Editor Aileen Cho about creating better collaboration with the A/E/C community.
Tony Pan Has Big Hopes for Clean Hydrogen 20.12.2024 34:42
The entrepreneur, inventor and co-founder of Modern Hydrogen talks pyrolysis, carbon capture – and what he wishes he’d done differently in college.
Seth Torma and Ron Williams on the Olympian—and Paralympian— Efforts to Prepare LA for ‘28 06.12.2024 40:06
Jacobs experts discuss the past and future Games, express transit lanes, The Dodgers, and a bit of ‘80s nostalgia.
Alicia McConnell and John Zuleger on the Evolution of UAVs for Bridge Inspections 26.11.2024 38:27
In the Critical Path podcast’s first-ever visual episode, two UAV experts with Rawlins Infra Consult update ENR on the latest and greatest in drone-driven bridge inspections. See the video!
Tommy Linstroth Talks Automating and Facilitating ESG Metrics For Construction Projects 14.11.2024 35:00
ENR Editors Aileen Cho and Jeff Yoders talk to the founder of Green Badger about LEED, SaaS and the LA Olympics.
A Conversation with ENR Legend Jan Tuchman 31.10.2024 40:19
ENR editors Aileen Cho and Jeff Yoders interview one of their own – the former ENR editor-in-chief – in a retrospective of her groundbreaking, adventure-filled career.
Paul Au and Ryan Louie on Tech-ing Up a New Terminal in San Francisco 16.10.2024 35:57
Rosendin’s Au and SFO’s Louie discuss the challenges of building high-tech networks into the $2.4B Harvey Milk Terminal 1.
Pat Sheehan on the Past, Present and Future of GZA 25.09.2024 34:38
The president and CEO discusses the firm’s growth strategies, the crucial area of water resources—and GZA the rapper.
Maj. Gen. Michael Walsh on Army Corps’ Disaster Response Strategies 03.09.2024 27:32
ENR Editor Aileen Cho talks with the retired Army Corps veteran about his experiences with post-disaster responses and water-related risks, including after Superstorm Sandy.
Crunch Creators See the Future of Construction Document Review 27.08.2024 33:31
Josh Levy and Trent Miskelly are out to disrupt document review in construction after founding artificial intelligence-powered Document Crunch. Jeff Yoders crunches the words with these entrepreneurs in a tech talk on the ENR Critical Path podcast.
Autodesk’s Amy Bunszel Talks BIM, GIS, AI and Big Data 31.07.2024 17:55
Autodesk Executive Vice President of Architecture Engineering and Construction Amy Bunszel talks with Jeff Yoders at the ESRI user conference and fills us in about Autodesk’s evolving partnership with GIS provider Esri, what big data and AI mean for their users and what AEC can learn from the world of mechanical design. She also has encouraging words for women in construction and technology.
Mike Culmo Knows His ABCs (Accelerated Bridge Construction) 25.07.2024 39:03
ENR Editors Aileen Cho and Jeff Yoders talk to the chief bridge engineer with CHA Consulting about ABC and sniffing out new bridge technologies from around the world (inspiring Jeff to sing).
Brian Kelly on California High-Speed Rail Progress 09.07.2024 29:01
ENR’s Aileen Cho talks with the outgoing CEO of the California High-Speed Rail Authority about winning hearts and minds (and settling lawsuits).Watch condensed interview here.
Dewberry’s David Dickson on Improving Safety Culture Across Jobsites 03.07.2024 33:43
David Dickson, associate vice president of health, safety and environment at Dewberry, based in Orlando, Florida, has led the transformation of the company’s safety program by cultivating a culture of safety on and off jobsites. In this interview, he tells ENR senior editor Emell Adolphus and southeast editor Derek Lacey how he did it.
Podcasts parecidos
O Replaio não é o publicador dos podcasts; os nomes dos programas, as capas e o áudio pertencem aos seus autores e são distribuídos por feeds RSS públicos