www.enr.com

ENR Critical Path Podcast

ENR’s Critical Path Podcast delivers insights from leading industry experts and decision-makers about the latest construction industry innovations, issues and developments.

Não deixe de visitar o site do podcast e apoiar quem o produz: www.enr.com

Autor

www.enr.com

Categoria

Business

Site do podcast

www.enr.com

Último episódio

6 de jul de 2026

Onde ouvir?

Podcasts no app Replaio Radio Em breve

Os podcasts estão chegando ao app. Instale agora e seja o primeiro a descobrir um jeito totalmente novo de curtir podcasts

Baixe no Google Play Instale grátis Android 5 mi+ downloads · nota 4,8 iOS em breve

Episódios

Modernizing Water Assets with High-Performance Polysiloxane Coatings 06.07.2026

Polysiloxane coatings are redefining long-term protection for water storage and treatment assets. In this episode, learn how these advanced systems outperform traditional epoxy and polyurethane coatings with superior UV resistance, durability and reduced maintenance needs. Explore how the smooth, non-porous surfaces of polysiloxanes help minimize biofilm and algae growth, supporting cleaner assets...

Alquist 3D’s Zach Mannheimer Talks 3D Printing, Wal-Mart Additive Manufacturing and Even New Urbanism 26.06.2026

Alquist 3D Chariman and Founder Zach Mannheimer talks to ENR Senior Editor Jeff Yoders about housing, the journey of 3D printing concrete homes and commercial products and how his company made additive manufacturerd Wal-Mart Supercenters.

GISI's Derek Amidon on a New Model for Advising On and Delivering Major Infrastructure Projects 17.06.2026

In a multimedia podcast, the CEO of GISI Consulting Group discusses how the collective utilizes a roster of A-list firms under one platform, with 10,000+ employees advising on megaprojects across the globe.

Women in Construction: Resilience, Confidence, and Earning Your Seat 16.06.2026

What does it take to build a lasting career in construction? Three senior women leaders from J.E. Dunn, Austin Industries, and Findorff share hard-won perspectives on resilience, navigating burnout, and earning a seat at the table. Sponsored by: CMiC

Dan McNichol and Bill Goodrich on their Second Avenue Subway Book 15.05.2026

The author and engineer chat with Aileen Cho, who accompanied McNichol on a cross-country infrastructure tour in 2015, about chronicling the messy and mesmerizing history of the New York City megaproject.

David Cayemitte on Helping Small Firms Succeed 29.04.2026

The CEO of Embrace Partners and CEO of the Minority Business Development Institute talks with Deputy Editor Aileen Cho about helping small contractors achieve business acumen and bonding capacity.

Autodesk’s Joe Speicher and Lalith Subramanian Talk Sustainability at ConExpo 16.04.2026

Jeff Yoders and Aileen Cho caught up with Autodesk’s Chief Sustainability Officer Joe Speicher and Global Vice President of Product and Engineering Lalith Subramanian at the ConExpo trade show in Las Vegas for a Tech Talk. Autodesk and the overall construction industry’s journey toward sustainability continues as workflows change and vendors like Autodesk push more cloud-connected workflows forwar...

Diane Gutierrez-Scaccetti On a Legacy of Transportation Leadership 13.03.2026

ENR Deputy Editor Aileen Cho caught up with HNTB’s Diane Gutierrez-Scaccetti at the Transportation Research Board conference to talk about transportation trends, mentoring and her legacy of leadership.

Bob Clark Discusses the Data Center Boom and Clayco’s Role in Delivery 04.03.2026

Jeff Yoders and Bryan Gottlieb welcome Clayco Executive Chairman Bob Clark back to the Critical Path for an exec talk about the data center boom and how Clayco is working to meet client demands for these mission critical facilities as well as get the story about the critical infrastructure of the future.

Laurens Wilkes On Reducing Disputes and Risk in Complex Projects 20.02.2026

The Chair, Infrastructure & Projects - Global Disputes at Winston & Strawn LLP discusses strategies to better deliver infrastructure. Sponsored by: University of Michigan – Michigan Engineering Online

Construction Tech Consultant Burcin Kaplanoglu Returns 03.02.2026

Construction technology consultant Burcin Kaplanoglu returns to the Critical Path with his third annual construction predictions podcast to kick off the still-new year. Senior Tech Editor Jeff Yoders moderates. Sponsored by: University of Michigan – Michigan Engineering Online

Michael Shapiro on Unlocking Successful Megaprojects 20.01.2026

The industry veteran talks—with raw candor—about his decades of experience with major infrastructure jobs, reflected in his recently published book.

Autodesk’s Allison Scott Talks About Construction’s Evolving Sustainability Story 22.12.2025

Autodesk’s sustainability and impact champion discusses how construction technology has evolved to meet the needs of contractors and designers, how industrialized construction offers new opportunities and even a bit about women in construction and her own journey from performing arts training to becoming a leader at Skanska and Autdodesk in construction and sustainability. Sponsored by: CMiC

Kelly Farrell and Jamie Macartney on the Transformative Experience of Building a School After the LA Wildfires 12.12.2025

The duo representing Gensler and C.W. Driver recount the roller-coaster ride of building a temporary campus for Angeleno students in a matter of weeks. Sponsored by: CMiC

Better Design for Better Construction 01.12.2025

Discover how Advanced Work Packaging (AWP) and data-driven solutions are transforming construction for safer, smarter, and faster project delivery. Brandy Aucoin, Solutions Consultant at Hexagon Brandy is a Solutions Consultant with 21 years in project execution, spanning dimensional control, civil design, and 7 years in design tech roles including software admin, clash detection, and AWP. Mark Me...

The State of Infrastructure AI 21.11.2025

Industry leaders reveal how AI is transforming infrastructure projects. Learn how firms use generative AI for design optimization, workflow automation, and workforce learning. Discover practical implementation strategies to turn AI into competitive advantage. Mark Coates, Vice President of Infrastructure Policy Advancement, Bentley Mark Coates is Bentley’s Vice President of Infrastructure Policy A...

What Engineers and Artists Can Learn From Each Other With Edgar Westerhof and Sarah Cameron Sunde 19.11.2025

ENR editors Pam McFarland and Corinne Grinapol sat down with the husband-wife team of Edgar Westerhof, vice president and U.S. climate adaptation lead at Arcadis and Sarah Cameron Sunde, an artist working at the intersection of performance, video, conceptual and public art, to talk about climate adaption, water, and art. Westerhof has been an integral part of the Big U and East Side Coastal Resili...

Earth Matters: Ep. 3 - A Conversation with Environmental Regulatory Compliance Expert Fred Wagner 29.10.2025

ENR Editors Aileen Cho and Pam McFarland talk with the former chief counsel to the FHWA and now principal advisor to Jacobs about the goal of achieving more streamlined review processes while still being environmentally responsible. Sponsored by: CMiC

VIATechnik’s Danielle Dy Buncio Talks Tech 13.10.2025

Danielle Dy Buncio, co-founder and CEO of VIATechnik, tells Jeff Yoders about Voyager, the company’s new digital twin platform and discusses construction AI, prefabrication and manufacturing in construction and the promise of construction technology today. Sponsored by: CMiC

Harmon Parker and Natalie McCombs on Saving Lives by Building Bridges 26.09.2025

The founder of Bridging the Gap Africa and a volunteer from HNTB talk with ENR’s Aileen Cho and Jeff Yoders about crocodiles, hippos, and finding a purpose. Sponsored by: https://ineight.com/

A Roving Digital Twins Podcast with Team D3’s Scott Bailey 15.09.2025

Jeff Yoders and Team D3 President President of AECO and Symetri Chief Business Development Officer Scott Bailey discuss making a virtual replica Gillette Stadium and Patriot Place and the future of digital twins at the Esri User Conference in San Diego. Sponsored by: https://ineight.com/

Tilly Chang on Transforming Transportation in the Bay Area 03.09.2025

ENR Deputy Editor Aileen Cho chats with the leader of the San Francisco County Transportation Authority about Presidio Parkway, Treasure Island, ITS America and more. Brought to you by the Project Management Institute Inc.: Maximizing Project Success that Fuels Construction Professionals

Omri Gainsburg on the Past, Present, and Possibilities of P3s in Transportation 04.08.2025

Meridiam’s COO for the Americas reflects on the evolution of P3s shortly after the 10-year anniversary of the Presidio Parkway opening. Brought to you by the Project Management Institute Inc.: Maximizing Project Success that Fuels Construction Professionals

Joe Sczurko on Leading the U.S. Arm of a Global Engineering Firm 21.07.2025

The WSP president chats with ENR about projects, people, and the occasional travel glitch. Sponsored by: Revizto

Boosting Tank Lining Lives to Meet Sustainability Targets 03.07.2025

Water tank owners no longer have to choose between durability or sustainability when using 100% solids linings. Extending service lives to 20 to 30 years, these materials offer sustainability, lower lifecycle costs and boost worker safety. Sponsored by: Sherwin Williams Speakers: Paul Trautmann, Market Director for Water Infrastructure, Sherwin-Williams Protective & Marine Steven Roetter, Mark...

Ouça o podcast ENR Critical Path Podcast no Replaio

Rádio e podcasts em um só app - grátis e sem cadastro. Instale hoje e não perca o lançamento

Baixe no Google Play

O Replaio não é o publicador dos podcasts; os nomes dos programas, as capas e o áudio pertencem aos seus autores e são distribuídos por feeds RSS públicos