jerzykuzminski

GreenEdge: Best in BESS - ENG

A podcast about battery energy storage and the Polish renewable energy market — no marketing fluff, just real examples and verified information. We cover the entire BESS project lifecycle: development, permitting, EPC, commissioning, optimization, and O&M. Benefits, risks, real costs, investor mistakes, and how to spot a reliable contractor. Universal BESS insights plus Polish market specifics — for investors entering storage business or companies looking to cut energy costs with C&I solutions. Hosted by Jerzy Kuźmiński

Author

jerzykuzminski

Category

Technology

Podcast website

podcasters.spotify.com

Latest episode

Jul 5, 2026

Where to listen?

Podcasts in the app Replaio Radio Coming soon

Podcasts are coming to the app soon. Install now and be the first to see a whole new take on podcasts

Get it on Google Play Install for free Android 5M+ downloads · 4.8 rating iOS soon

Episodes

12: Ancillary Services: FCR, aFRR, mFRR 05.07.2026

FCR, aFRR, and mFRR are three different products — not three names for the same thing. Each one works differently, has different technical requirements, a different revenue profile, and a different risk structure. A surprising number of people in this industry use these three acronyms interchangeably. That's an expensive misunderstanding when you're building a financial model or negotiatin...

11: Entering the Balancing Market in Poland 21.06.2026

In this episode we walk you through everything that stands between a commissioned BESS project and its first revenue from ancillary services: the regulatory structure of the Polish balancing market, the hardware certification requirements that are entirely specific to Poland, the IT infrastructure PSE requires, and the DUB qualification process itself — including where projects consistently get st...

10: BESS Project Financing 07.06.2026

You can have the right location, a solid grid connection agreement, a credible supplier, and an experienced EPC on the shortlist. None of that matters if the financing doesn't close. And the reason it doesn't close is almost always the same: the investor structured the project without understanding what the bank actually needs to see. In this episode I go through BESS project financing fro...

09: The EPC Tender - Selecting the right Contractor 31.05.2026

You have your permits, your equipment order, and your grid connection agreement. Now you need someone to actually build the thing. And this is where a lot of projects go wrong — not because of bad technology or poor financing, but because of a contractor selection process that wasn't designed to find the right partner. In this episode I cover the full EPC procurement process from both sides of...

08: NIS2 and Cybersecurity in BESS Project 24.05.2026

On the 19th of February 2026, Poland signed the amended Act on the National Cybersecurity System — the Polish implementation of the EU NIS2 Directive. For BESS investors and developers, this is not an IT compliance story. It's a project risk story, which affects you whether your entity is directly regulated or not. In this episode: why the energy sector — including battery storage — is explici...

07: SGU - Significant Grid User 09.05.2026

In September 2025, for the first time in Poland's history, battery energy storage systems were included on the SGU list — Significant Grid Users. If you are developing or financing a BESS project with a capacity of at least 10 MW and 40 MWh — this episode is for you. In this episode: what SGU is and where this obligation comes from; who ends up on the list and how that process works from the i...

06: Choosing a BESS Supplier 02.05.2026

You've developed your project, secured the permits, and now you need to buy the system. And this is where a lot of investors — including experienced ones — discover they weren't as prepared as they thought. The BESS supplier market is crowded, opaque, and the differences between offers that look identical on paper can be enormous in practice. In this episode, I walk through how the supplie...

05: How to Develop a BESS Project in Poland 25.04.2026

Development is where most BESS projects succeed or fail — not on the construction site, but in the eighteen to twenty-four months before a single container arrives. In this episode, I walk you through the full development process for a utility-scale stand-alone project in Poland: site selection, land rights, zoning under the new General Plan regime, environmental decisions, grid connection under t...

04 - UC84 - Poland's New Grid Connection Rules 19.04.2026

On April 15, 2026, Poland published UC84 in the Journal of Laws — a comprehensive amendment to the Energy Law that fundamentally changes how grid connections work. The law enters into force on April 29, 2026. After almost a year of legislative work, numerous controversies, and Senate amendments, we have the final text. Time to explain what changed and what it means for BESS and renewable energy in...

03: C&I Energy Storage 11.04.2026

C&I storage is not just small cabinet systems — we're talking about containerized solutions of several megawatt-hours that can fundamentally change how your business operates, with payback periods of three to four years for energy-intensive facilities rather than the seven to eight years typical in utility-scale projects. This episode covers the Commercial & Industrial segment: energy...

02: What's Really Inside a BESS Container? 29.03.2026

From the outside, a battery container looks simple — just a box. But what's inside determines whether your investment performs for fifteen years or starts causing problems after two. In this episode, we open up the container and examine every critical component: battery cells and chemistry, BMS architecture, power conversion systems, cooling and heating (critical for Polish winters), fire safe...

01: What is BESS and Why Poland 22.03.2026

The first episode of the English edition of Best in BESS — a podcast for international investors and developers exploring the Polish battery energy storage market. Poland has issued grid connection permits for an estimated 70 GWh of energy storage. Over 400 projects applied for the NFOŚiGW subsidy program, and the first utility-scale BESS projects are finally going live in 2026. The opportunity is...

Listen to the GreenEdge: Best in BESS - ENG podcast in Replaio

Radio and podcasts in one app - free, with no sign-up. Install today and do not miss the launch

Get it on Google Play

Replaio is not a podcast publisher; show names, artwork and audio belong to their authors and are distributed through public RSS feeds.