Josh Rhodes & Matt Boms
Energy Capital Podcast
The Texas power grid is being rebuilt in real time. Energy Capital covers the policy fights, market mechanics, and technical decisions shaping what comes next. Hosted by Josh Rhodes (UT Austin) and Matt Boms (TAEBA), with the policymakers, regulators, and researchers at the center of it. Produced by ClarityForge Studios. Topics include ERCOT market operations, grid reliability, renewable integration, distributed energy resources, interconnection and transmission planning, regulatory economics, energy storage, demand response, and the Texas electricity market. New episodes weekly. on Texas ener...
Be sure to visit the podcast's website and support the creator: www.texasenergyandpower.com
Author
Josh Rhodes & Matt Boms
Category
Podcast website
Latest episode
Nov 18, 2026
Where to listen?
Podcasts in the app Replaio Radio Coming soonPodcasts are coming to the app soon. Install now and be the first to see a whole new take on podcasts
Episodes
A blue Texas meets a red Senate 18.11.2026 48:03
Texas Democrats won the governor’s office, the lieutenant governor’s office, and the Texas House on November 3. Republicans kept the Texas Senate, which writes its own rules and confirms appointees. On this week’s Energy Capital Podcast, Joshua Rhodes talks with Eric Goff, founder of Goff Policy, about what Governor-elect Gina Hinojosa and Lt. Gov.-elect Vikki Goodwin can do alone and what they mu...
Turning renewable credits into project financing 11.11.2026 39:14
A solar or wind farm in ERCOT can watch wholesale prices fall below zero, which makes a project hard to finance. Ever.green sells companies 5- to 10-year contracts for a project’s renewable energy certificates (RECs, credits for megawatt-hours of clean power), giving developers revenue they can take to the bank. A pending greenhouse gas protocol change would phase in hourly matching, counting clea...
Data centers have to earn rural Texas 28.10.2026 44:26
In August, Gov. Greg Abbott ordered ERCOT to audit the data centers seeking to connect to the grid, pausing ERCOT’s batch zero study of the first cohort for a new process to connect large loads as a group. In September he told the Texas Commission on Environmental Quality to halt data center permits. Rep. Drew Darby, the San Angelo Republican who chairs the House Energy Resources Committee, wants...
Texas energy heads into the 2027 session 21.10.2026 46:32
House Bill 5200 would have had ERCOT evaluate grid-enhancing technologies (sensors, software and advanced conductors that raise an existing transmission line’s capacity). It passed the House 128-0 in 2025. The Senate never gave it a hearing. Its author, State Rep. Rafael Anchía (D-Dallas), says no senator would carry it, and he plans to refile it for the session that opens Jan. 12. Lawmakers retur...
The case for lower utility profits 14.10.2026 57:43
On this week’s Energy Capital Podcast, Joshua Rhodes talks with Ellis, now research director at MarketClear Utility Policy Research and an expert witness for consumer groups in rate cases. They discuss why the gap persists and how an auction could close it. Chapters 00:00 – Introducing Mark Ellis 00:57 – How utilities make money 07:08 – From Sempra insider to utility critic 12:53 – What makes a re...
How far can batteries stretch Texas transmission? 30.09.2026 41:23
In ERCOT’s new interconnection process for large loads, a data center can connect sooner as a provisional controllable load resource. That is, ERCOT can curtail power above an agreed firm level. A study from Base Power and Peak Energy shows batteries near the transmission lines to a data center could stand in for most of that curtailment. In the study, 80 megawatts of batteries would clear every t...
Everything moving on the Texas grid 16.09.2026 46:16
The PUCT approved the southernmost of three 765 kV paths into the Permian on September 13. It has not approved the center path: administrative law judges recommended denying it in August, and chairman Thomas Gleeson sent it back asking what the lines are needed for and what they would save customers. Michael Webber’s answer is that Texas has run this experiment. CREZ, the Competitive Renewable Ene...
The Texas Energy Fund's first co-op loan 26.08.2026 40:54
Rayburn Electric Cooperative broke ground in June on a 570 MW gas plant in Sherman, backed by a $411 million Texas Energy Fund loan at 3 percent, the fund’s seventh generation loan and first to a cooperative. Rayburn is also putting batteries in members’ houses. Both run on the same logic: Rayburn generates the power and owns the transmission, so it earns on both. An independent power producer ear...
What the Sierra Club wants from the Texas grid 12.08.2026 44:13
Last month the Public Utility Commission of Texas held public hearings on plans to build giant 765 kilovolt transmission lines. The controversial plan drew complaints from influential voices, including Senate Business and Commerce Chairman Charles Schwertner, who asked commissioners to deny the pending applications for the lines in a letter. Cyrus Reed sat through the roughly 15 hours of testimony...
How linear generators can fit into the Texas grid 05.08.2026 36:26
Wind, solar, and storage are the only new categories of generation to reach the US power system at scale in fifty years. Craig Gordon thinks his company is adding one. Mainspring Energy’s linear generator drives magnets through copper coils rather than burning fuel in a flame, switches between natural gas, biogas, propane, and hydrogen under load, and ramps from minimum to full output in 25 second...
Ten gigawatts are parked in American driveways 29.07.2026 39:22
About 6 million electric vehicles are on American roads, and roughly 1 million of them can already export power back to the grid. A typical one sits parked about 95 percent of the day, plugged in for 12 to 14 hours while needing 2 to 3 hours of charge. Texas still meets most of that capacity as load. That works out to roughly 10 gigawatts of export capacity. In ERCOT the value of tapping it splits...
Wind is keeping West Texas ranches solvent 22.07.2026 45:18
Cattle prices swing, goat prices swing, and the drought comes whether or not the ranch can afford it. For a fifth-generation West Texas operation, the search for income that holds steady through all of it comes from an unexpected source: the wind. A wind lease pays the same in a dry year as a wet one, creating a floor under an operation otherwise exposed to weather and commodity prices. When neigh...
Why some large loads insist on paying their way 15.07.2026 40:16
Some of the largest electricity buyers in the world have a message for Texas: charge us. The Texas Energy Buyers Alliance was the first organization to propose that large loads pay transmission charges tied to their approved capacity. The idea is to protect other customers as the grid builds out. The scale explains why. ERCOT estimates up to 110 gigawatts of new large loads could seek to connect o...
Texas competes on everything except transmission 08.07.2026 50:23
Texas built a competitive retail electricity market: consumers choose among roughly a hundred providers, and generators build power plants at their own risk with no guaranteed return. Transmission, the high-voltage lines that move power from where it is made to where it is used, runs on a different model. One utility builds each line and recovers every cost from ratepayers, plus a return, on time...
What batch zero settles and what it leaves open 01.07.2026 49:18
Batch zero stops being theoretical on July 11. That is the day ERCOT’s rule for connecting large new customers takes effect. The new policy replaces a process that involved studying each giant load independently, then ordering restudies when new giant loads joined the queue, leaving projects stuck in a serial loop. Two prior episodes of this show traced how the new rule was designed. This one asks...
Why PJM is looking at the Texas grid 24.06.2026 37:47
ERCOT made a choice years ago that most of the country is now reconsidering. Texas runs an energy-only market with no capacity payments, connects generation through connect-and-manage, sorts out delivery in dispatch, and pushes interconnection risk onto developers. That design is a big part of why Texas has added generation faster than any other U.S. grid. PJM, the operator for much of the eastern...
Inside the PUC's Cost-Allocation Overhaul with PUC Chairman Gleeson 10.06.2026 43:17
Texas spent five years rebuilding its electrical grid based on the lessons of Winter Storm Uri. Now regulators face a harder question: who pays for the surge of large new customers trying to connect? The projections for electricity demand run far above what will actually get built, and hyperscalers want to power their data centers within 18 months, a pace much faster than the three-to-five years l...
How will data centers pay for power? 03.06.2026 44:29
Right now, connecting a data center to the grid works like Texas hog season: no defined season, no bag limits, first-come-first-served, file as many interconnection requests as you want. Travis Kavulla’s recent essay in American Affairs argues the power industry needs something closer to deer season, with defined rounds, allocation rules, and prices that reflect what grid access actually costs. Th...
How Texas decides which data centers to connect 27.05.2026 49:30
ERCOT now has roughly 445 gigawatts of large loads asking to connect to the Texas grid, a figure so large that Joshua Rhodes says it might as well be infinite, because the system cannot physically build for all of it. To sort real projects from speculative ones, ERCOT is launching a new screening process called batch zero, and stakeholders voted to advance it at last week’s Technical Advisory Comm...
How Texas plans to serve ‘infinite demand’ 20.05.2026 43:03
Texas has spent decades building transmission to serve load growth. The pattern worked when growth rose steadily with new homes, oil and gas operations, and the gradual expansion of the state’s industrial base. It is being tested by a different kind of customer: data centers requesting interconnection at a scale that exceeds what the grid can physically deliver. Eric Goff, founder of Goff Policy a...
Austin Energy Enters the Next Phase of Decarbonization 13.05.2026 41:28
Austin Energy’s power generation hit the 65 percent carbon-free level in 2024, and the municipal utility is targeting 100 percent carbon-free load by 2035, one of the most aggressive clean energy targets of any utility in Texas. Austin Energy is one of the largest municipally owned utilities in the country and one of the few vertically integrated utilities operating inside ERCOT’s deregulated mark...
Process is Killing Texas Data Center Projects 06.05.2026 42:01
As the data center buildout in Texas accelerates, the public conversation has fixated on generation, interconnection queues, and gigawatts. But the firms actually structuring these deals see a different problem entirely: process. In this episode, Joshua Rhodes speaks with Maura Yates, chief executive of Mothership Energy. Mothership is one of the most active retail electricity providers in ERCOT’s...
Texas Bets on Speed, with Gin Kinney 29.04.2026 48:18
Texas generators and grid operators used to spend a decade or two planning for new power plants. But as Gin Kinney, chief administrative officer at NRG Energy, told Energy Capital Podcast hosts Matt Boms and Josh Rhodes at CERAweek in Houston this year, the company’s planning horizon has collapsed to 12-18 months. The company’s activity reflects the dynamic growth of the ERCOT grid. Kinney said NR...
Transmission Takes a Decade, Load Doesn't — with Raina Hornaday 22.04.2026 37:40
ERCOT’s all-time demand record is 85.5 gigawatts. Yet by the end of last year, the grid manager’s interconnection queue included 432 gigawatts of generation requests. ERCOT also received 225 gigawatts-worth of new large load requests last year. The critical factor connecting the two: transmission lines. But the transmission improvements that would accommodate such dramatic grid growth aren’t growi...
What a Wind Lease Is Worth Now with Rod Wetsel 15.04.2026 40:12
In 1999, a rancher walked into a Sweetwater, Texas law office with a 50-page wind lease from landmen in South Dakota. The lawyer, an oil and gas attorney named Rod Wetsel, told him to throw it in the trash. The rancher insisted he take another look. That lease became the first of an estimated 10,000 that Wetsel and his firm would negotiate across Texas. At one point, the line of landowners waiting...
Similar podcasts
Replaio is not a podcast publisher; show names, artwork and audio belong to their authors and are distributed through public RSS feeds.