www.enr.com

ENR Critical Path Podcast

ENR’s Critical Path Podcast delivers insights from leading industry experts and decision-makers about the latest construction industry innovations, issues and developments.

Não deixe de visitar o site do podcast e apoiar quem o produz: www.enr.com

Autor

www.enr.com

Categoria

Business

Site do podcast

www.enr.com

Último episódio

6 de jul de 2026

Onde ouvir?

Podcasts no app Replaio Radio Em breve

Os podcasts estão chegando ao app. Instale agora e seja o primeiro a descobrir um jeito totalmente novo de curtir podcasts

Baixe no Google Play Instale grátis Android 5 mi+ downloads · nota 4,8 iOS em breve

Episódios

Avery Bang 02.06.2021

A multiple-degree-holding 30-something, the outgoing CEO of Bridges to Prosperity reminisces about globetrotting adventures and chats about new entrepreneurial challenges

Bob Clark 04.05.2021

Bob Clark has grown Clayco from a small St. Louis design-builder more than 30 years ago into an annual high performer on the ENR Top 400. In this ENR Exec Talk, he talks with Jeff Yoders and Aileen Cho about his Ride the Wave tour where he’s visiting all of Clayco’s job sites, how he founded the company on the premise of changing adversarial and antiquated processes, a bad call from OSHA on encour...

Brian Skripac 27.04.2021

CannonDesign’s vice president and director of BIM and VDC programs tells us about levels of development, modular construction, how architects and contractors are creating more model-friendly contract documents that allow better collaboration in the design and construction process, the changing process of project delivery and how redesigning that process, itself, has become a challenge, and even a...

Kristina Swallow 27.04.2021

The director of the Nevada Department of Transportation talks about new highway and public works projects, navigating the maze of federal transportation spending, new ways to look at investment in infrastructure, MAP-21 and even a little about STEM and her inventive Twitter handle. 

Palmina Whelan 27.04.2021

As managing director of American Airlines, Palmina Whelan guided strategic plans for airport master planning and development across the Northeast, Dallas and Central Regions of both the U.S. and Canada for 15 years. She managed more than $6 billion in capital construction and worked with contractors, designers, airport authorities and state and regional government stakeholders. She recently launch...

Michael McKelvy 19.04.2021

The President and CEO of Gilbane Building Co. and former chief delivery officer at CH2M Hill Cos., Michael McKelvy talked with ENR Managing Editor Scott Blair about Safety Week 2021 (May 3-7), an event that he’s the chair of this year. McKelvy and Blair discussed this year’s theme, holistic safety and the importance of everyone at the job site being both physically and mentally present.

Randell “Randy” Iwasaki 19.04.2021

The former executive director of the Contra Costa Transportation Authority and director of the California Dept. of Transportation is now leader of state and local transportation at Amazon Web Services. Randy Iwasaki spoke with ENR Transportation Editor Aileen Cho and Associate Technology Editor Jeff Yoders about new highway technology, robotics and autonomous vehicles and how to manage change in l...

Diana Mendes 19.04.2021

HNTB’s corporate president of infrastructure and mobility equity is responsible for shaping transportation and mobility equity policy through collaboration with federal, state and local agency leaders. Diana Mendes spoke with ENR Transportation Editor Aileen Cho and Associate Technology Editor Jeff Yoders about how transportation design can unite diverse neighborhoods, not divide them, how to recr...

Webcor CEO Talks Pandemic Response 24.03.2020

Jes Pedersen, CEO and president of Webcor Builders, spoke with ENR senior editor Jeff Rubenstone about how his company is keeping workers safe and projects on track during the pandemic crisis. Recorded March 23, 2020.

Keith Clarke: Construction Must Rise to the Challenge of Climate Change 18.12.2019

Former Atkins CEO Keith Clarke says the construction industry has to take the lead in tackling the problems of climate change and the broader decarbonization of the global economy. Interview by Debra Rubin, audio engineering by Jeff Rubenstone. Photo courtesy of Bentley

Ouça o podcast ENR Critical Path Podcast no Replaio

Rádio e podcasts em um só app - grátis e sem cadastro. Instale hoje e não perca o lançamento

Baixe no Google Play

O Replaio não é o publicador dos podcasts; os nomes dos programas, as capas e o áudio pertencem aos seus autores e são distribuídos por feeds RSS públicos