Mike Holt
The Mike Holt Podcast
We’re committed to improving the electrical industry in every way we can. We strive to provide as much as we can to the industry at no charge. From industry publications to Mike Holt guides on key topics like Swimming Pools and Marinas, we provide an abundance of content to help you.
Where to listen?
Podcasts in the app Replaio Radio Coming soonPodcasts are coming to the app soon. Install now and be the first to see a whole new take on podcasts
Episodes
Working Space about Electrical Equipment [110.26, 2020 NEC] 10.08.2021 29:06
110.26 Working Space about Electrical Equipment – https://www. MikeHolt.com/code. Clearances and working space around electrical equipment are necessary to provide a safe working environment for electrical professionals. The rules that are in place to ensure this space is available are often misunderstood. Be sure you understand these requirements as we discuss Part II of Article 110 in the NEC; m...
Voltage-Drop - Manufacturer and NEC Recommendations [210.19(A) Note 3, 2020 NEC] 10.08.2021 30:33
According to 110.3(B) in the NEC, equipment, including conductors, must be installed in accordance with the manufacturer’s instructions. But what about when the length of these conductors creates a voltage drop? Is voltage drop just a recommendation in the NEC and not really enforceable? Find out in this podcast where we discuss the ramifications of voltage drop in branch circuit and the energy an...
Tamper-Resistant Receptacles [406.12, 2020 NEC] 10.08.2021 12:59
406.12 Tamper-Resistant Receptacles - https://www. MikeHolt.com/code. The locations where tamper-resistant receptacles are required have been greatly expanded in 406.12 to include all education facilities, areas where people are awaiting transportation, dormitory units, and assisted living facilities.
Splices in Panel Enclosures [312.8, 2020 NEC] 10.08.2021 2:25
312.8 Splices in Panel Enclosures – https://www. MikeHolt.com/code. When it comes to electrical enclosures, “As long as we can get the cover on, we’re good.” is the mindset of many. The NEC has requirements for fill or how much space inside an enclosure is available for wiring and electrical devices as you’ll see when you listen to this podcast on section 312.8.
Solar Photovoltaic (PV) Systems, Rapid Shutdown [690.12] 10.08.2021 31:43
The 2020 Code cycle brought many changes to Article 690, Solar Photovoltaic (PV) Systems. Some of the more notable changes were in section 690.12 for "Rapid Shutdown" and are discussed in this podcast.
Solar Photovoltaic (PV) Systems, Grounding Electrode System [690.47] 10.08.2021 9:30
Do you know how a Grounding Electrode System works? What about grounding for PV Systems? Is a grounding system even required? The answers to these questions and more can be found in this podcast.
Solar Photovoltaic (PV) Systems, Equipment Grounding and Bonding [690.43] 10.08.2021 6:23
Bonding and Grounding of PV Equipment is a requirement in Section 690.43 of the NEC and references sections in Article 250. Find out how to ground the equipment and why it needs to be done!
Sizing Raceways Using Annex C [2020 NEC] 10.08.2021 11:13
If you've pulled wire into a raceway, you understand the reason to have limits on the wire fill for raceways. In this podcast, we’ll discuss the most common condition, where multiple conductors of the same size are installed together in a raceway and the maximum number of conductors permitted can be determined from the tables in Annex C.
Service Equipment Surge Protection [230.67, 2020 NEC] 10.08.2021 2:18
230.67 Service Equipment Surge Protection - https://www.mikeholt.com/code. This new section requiring the installation of a surge-protective device (SPD) for all dwelling unit services has been a long time coming. Up until now, dwelling unit surge protection has been optional and usually an “extra” for the electrician. Section, 230.67, now requires surge protection for all dwelling unit services t...
Service Disconnects, Six Maximum [230.71, 2020 NEC] 10.08.2021 6:50
230.71 Service Disconnects, Six Maximum – https://www. MikeHolt.com/code. When it comes to service disconnects, the rule of six movements of the hand is pretty well established but, can there ever be more than six? Just how does the NEC define a “service” and does this definition allow for more than six service disconnects? In this podcast on section 230.71, we discuss the requirements regarding t...
Service Disconnecting Means [230.71, 2020 NEC] 10.08.2021 11:09
230.71 Service Disconnecting Means - https://www. MikeHolt.com/code. Although the rule of six grouped service disconnects didn’t change, disconnects are now required to be compartmentalized to reduce the hazards associated with arc-flash and arc-blast. This might not seem like a big change but, it makes most of the available multi-meter centers and switch boards ineligible for use to meet these re...
Similar podcasts
Replaio is not a podcast publisher; show names, artwork and audio belong to their authors and are distributed through public RSS feeds.