Keith Bontrager

Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks

Attending these meetings in person is very time consuming. They are long and there is often quite a bit of administrative business done. Not many people have the time to do it. And, even if you do, it is not a very efficient use of time. But the meetings are important. They are the best way to keep track of what the agencies are up to. These podcasts make access to that content very simple and efficient. I edit the podcasts to break the meetings into short, topical episodes. You can listen to the episodes that cover topics that matter to you. The cool thing about doing that with a podcast is t...

Author

Keith Bontrager

Category

Government

Podcast website

rss.com

Latest episode

Mar 19, 2026

Where to listen?

Podcasts in the app Replaio Radio Coming soon

Podcasts are coming to the app soon. Install now and be the first to see a whole new take on podcasts

Get it on Google Play Install for free Android 5M+ downloads · 4.8 rating iOS soon

Episodes

11/6/25 SCCRTC P4 - Adoption of the Consolidated Grants Program 13.11.2025

Adoption of the Consolidated Grants Program and Regional Transportation Improvement Program Following consideration of public and advisory committee input, the Commission adopted the 2025 Consolidated Grants Program and the 2026 Regional Transportation Improvement Program (RTIP), approving road, bike, pedestrian and transit projects to receive the region’s anticipated formula share of certain stat...

11/6/25 SCCRTC P3 - Caltrans Report 13.11.2025

Caltrans Report RTC Documents are here: https://www.sccrtc.org/meetings/regional-transportation-commission/agendas/ Original video is here: https://youtu.be/J4cE6Pz_U54?si=twHZsN6hTylIiwXY

11/6/25 SCCRTC P2 - Director's Report 13.11.2025

Director's Report RTC Documents are here: https://www.sccrtc.org/meetings/regional-transportation-commission/agendas/ Original video is here: https://youtu.be/J4cE6Pz_U54?si=twHZsN6hTylIiwXY

11/6/25 SCCRTC P1 - Commissioner's Reports 13.11.2025

Meeting with California Transportation Commission Commissioners Fred Keeley, Manu Koenig, and Eduardo Montesino met with California Transportation Commissioner (CTC) Carl Guardino and staff from both agencies on October 20, 2025, regarding the Active Transportation Program (ATP) Cycle 6 grant award for the Coastal Rail Trail Segments 8 through 11 project. The meeting was held to discuss potential...

10/2/25 SCCRTC P7 - Q&A part 2 08.10.2025

Q&A part 2 following Part 5 - Coastal Trail Project Delivery

10/2/25 SCCRTC P6 - Q&A part 1 08.10.2025

Q&A - part 1 - Coastal Trail Project Delivery

10/2/25 SCCRTC Part 5a - Coastal Trail Project Delivery (less long introduction) 08.10.2025

The same as Part 5 but without the long introduction and project background. Overview Coastal Rail Trail Segments 8-11 face significant funding and delivery challenges. Escalating costs and funding gaps threaten project timelines and scope. Multiple phasing and scope reduction options analyzed; none fully close the funding gap. $19.5M federal RAISE grant and $20.5M Safe Streets for All grant (pend...

10/2/25 SCCRTC Part 5 - Coastal Trail Project Delivery 08.10.2025

Overview Coastal Rail Trail Segments 8-11 face significant funding and delivery challenges. Escalating costs and funding gaps threaten project timelines and scope. Multiple phasing and scope reduction options analyzed; none fully close the funding gap. $19.5M federal RAISE grant and $20.5M Safe Streets for All grant (pending) are key funding sources. Measure D sales tax is critical for leveraging...

10/2/25 SCCRTC Part 4 - Caltrans Report 08.10.2025

Overview Caltrans announced the 2026-27 Sustainable Transportation Planning Grant Program is open for applications, with $17.5M available for sustainable communities planning, $1.5M for strategic partnership planning, and $3M for transit partnerships. Multiple emergency and planned infrastructure projects are underway, including drainage repairs, retaining wall replacements, and erosion control, w...

10/2/25 SCCRTC Part 3 - Director's Report 08.10.2025

Director's report. These podcasts were taken from Community TV's original video. It is available here: https://communitytv.org/watch/government-demand/

10/2/25 SCCRTC Part 2 - Coastal Rail Council appointments 08.10.2025

The RTC’s appointments to the Coastal Rail Council. The CRCC is a coalition of transportation agencies and stakeholders along California's Central Coast. These podcasts were taken from Community TV's original video. It is available here: https://communitytv.org/watch/government-demand/

10/2/25 SCCRTC P1 - Commissioner Reports 08.10.2025

Commissioner reports. These podcasts were taken from Community TV's original video. It is available here: https://communitytv.org/watch/government-demand/

9/4/25 SCCRTC P8 - Measure D Expenditures and Financing Q&A 09.09.2025

Action Items Com. Clark Provide Updated Interim Trail Cost Estimates Pull together updated information on interim trail cost estimates and bring it back to the commission. Com. Schiffrin Direct Staff to Seek Additional Funding Contact state and federal representatives and the CTC to appeal for necessary additional funding to complete trail segments 8-11. Com. Schiffrin Schedule Public Discussion o...

9/4/25 SCCRTC P7b - Measure D Expenditures and Financing Continued 08.09.2025

Overview Significant funding gap for rail trail segments 8-11, with a shortfall of $17 million (projected cost: $137M + $88M = $225M; grants received: $120M). Measure D revenues are nearly fully committed, limiting future borrowing and project capacity. Urgency to secure additional funding by June 2027 to avoid losing $120M in outside grants. No contingency for litigation costs included in current...

9/4/25 SCCRTC P7a - Measure D Active Transportation Expenditures and Financing Options 08.09.2025

9/4/25 SCCRTC P7a - Measure D Active Transportation Expenditures and Financing Options Summary Overview Measure D active transportation projects are progressing faster than pay-as-you-go funding allows, necessitating new financing options. Over $150 million in state and federal funds have been leveraged for the coastal rail trail. Recent project completions include segment 7 to the Santa Cruz Whar...

9/4/25 SCCRTC P6 - Hwy1 State Park to Bay-Porter Cost Overruns 08.09.2025

9/4/25 SCCRTC P6 - Hwy1 State Park to Bay-Porter Cost Overruns Summary Overview Highway 1 Segment 2 construction is about 45-50% complete . $7.7 million in additional costs identified; $1.5 million in savings found. Contingency fund increased from 5% to 10% due to unforeseen issues. Major cost drivers: design changes, unforeseen site conditions, tree removal, and public safety measures. Commission...

9/4/25 SCCRTC P5 - Caltrans Report 08.09.2025

Caltrans Report

9/4/25 SCCRTC P4 - Director’s Report Continued 08.09.2025

9/4/25 SCCRTC P4 - Director’s Report Continued Summary Action Items Speaker C Clarify Segment Eight Timeline Confirm and communicate that segment eight construction will start late 2026 and complete by spring 2027. Speaker A Highlight Community Investments Ensure all projects clearly communicate the investment from Measure D to the community to support future funding efforts. Funding and Community...

9/4/25 SCCRTC P3 - Director’s Report 08.09.2025

Overview $125 million spent on local transportation projects since Measure D inception through June 2024. $350 million in outside grants secured using Measure D as leverage. Zero Emission Passenger Rail & Trail Project community outreach completed; final report expected by October . Temporary pedestrian/bike path over Murray Street Bridge: $1.7 million cost, funding being sought after CTC deni...

9/4/25 SCCRTC P2 - Commissioner Reports 08.09.2025

9/4/25 SCCRTC P2 - Commissioner Reports Summary Overview Commissioner Jillian Ritter introduced as new First District RTC alternate. Ad hoc committee continues work on encroachments and easements along Santa Cruz Branch Trail. Updates on regional rail and transportation projects, including hydrogen train demonstration. Support and flexibility for Capitola event logistics highlighted as economic bo...

9/4/25 SCCRTC P1 - Consent Agenda 08.09.2025

9/4/25 SCCRTC P1 - Consent Agenda Summary Action Items Speaker A Move motion to amend subsidy policy Move to amend the consent agenda to include direction that future subsidies only support e-bikes pedal assisted up to 20 mph, excluding faster models. Speaker C Second motion to amend subsidy policy Second the motion to limit subsidies to e-bikes with max 20 mph pedal assist, pending public input....

8/26/25 SC City Council P4 - Murray Street Bridge Project Update - More comments and Q&A 30.08.2025

Update on Actions to Support Seabright and Harbor Businesses Affected by the Murray Street Bridge Project - More comments and questions The full agenda and video is here: https://ecm.cityofsantacruz.com/OnBaseAgendaOnline/Documents/ViewDocument/City_Council_Regular_Meeting_2534_Agenda_Packet_8_26_2025_1_00_00_PM.pdf?meetingId=2534&documentType=AgendaPacket&itemId=0&publishId=0&isSe...

8/26/25 SC City Council P3 - Murray Street Bridge Project Update - Q&A 30.08.2025

Update on Actions to Support Seabright and Harbor Businesses Affected by the Murray Street Bridge Project - Staff Presentation The full agenda and video is here: https://ecm.cityofsantacruz.com/OnBaseAgendaOnline/Documents/ViewDocument/City_Council_Regular_Meeting_2534_Agenda_Packet_8_26_2025_1_00_00_PM.pdf?meetingId=2534&documentType=AgendaPacket&itemId=0&publishId=0&isSection=fal...

8/26/25 SC City Council P2 - Update on Support for Businesses Affected by the Murray Street Bridge Project - Staff Presentation 30.08.2025

Update on Actions to Support Seabright and Harbor Businesses Affected by the Murray Street Bridge Project - Staff Presentation There's a video of the presentation here: https://youtu.be/ZxiG18ps2tE The full agenda and video is here: https://ecm.cityofsantacruz.com/OnBaseAgendaOnline/Documents/ViewDocument/City_Council_Regular_Meeting_2534_Agenda_Packet_8_26_2025_1_00_00_PM.pdf?meetingId=2534&d...

8/26/25 SC City Council P1 - Transportation and Parking Challenges 30.08.2025

Transportation and Parking Challenges near transit development projects The full agenda and video is here: https://ecm.cityofsantacruz.com/OnBaseAgendaOnline/Documents/ViewDocument/City_Council_Regular_Meeting_2534_Agenda_Packet_8_26_2025_1_00_00_PM.pdf?meetingId=2534&documentType=AgendaPacket&itemId=0&publishId=0&isSection=false https://www.youtube.com/watch?v=Z9Rev9E2ndk&list...

Listen to the Santa Cruz County Transit and Transportation Agency Meetings - Audio Tracks podcast in Replaio

Radio and podcasts in one app - free, with no sign-up. Install today and do not miss the launch

Get it on Google Play

Replaio is not a podcast publisher; show names, artwork and audio belong to their authors and are distributed through public RSS feeds.