Dr. Mark T. Jones Sr.

Live Long Lead Well

The purpose of this podcast is to assist spiritual and business leaders in the cultivation of spiritual, emotional, and physical lifestyle habits that will ensure well being.

Be sure to visit the podcast's website and support the creator: podcasters.spotify.com

Author

Dr. Mark T. Jones Sr.

Category

Education

Podcast website

podcasters.spotify.com

Latest episode

Nov 7, 2026

Where to listen?

Podcasts in the app Replaio Radio Coming soon

Podcasts are coming to the app soon. Install now and be the first to see a whole new take on podcasts

Get it on Google Play Install for free Android 10M+ downloads · 4.7+ rating iOS soon

Episodes

Setting Leadership Expectation 03.02.2024

23 expecations of leaders for our 23rd year of ministry.

Special Feature: Interview with Tiana's Tea on Marriage & Dating P.2 02.02.2024

Interview Part 2

Special Feature: Interview with Tiana's Tea on Marriage & Dating P.1 02.02.2024

Interview on relationships

Shielding Your Mind From Negative People 02.02.2024

Phil 4:8 Finally, brethren, whatsoever things are true, whatsoever things are honest, whatsoever things are just, whatsoever things are pure, whatsoever things are lovely, whatsoever things are of good report; if there be any virtue, and if there be any praise, think on these things.

Growing To Like Yourself 26.01.2024

Psalms 139:14   14  I praise you because I am fearfully and wonderfully made; your works are wonderful, I know that full well.

Managing Multiple Endeavors (Entrepreneurship lesson) 19.01.2024

Con·ver·gence Harmonizing, the process or state of converging.

10 Keys for Personal Competence 12.01.2024

1 Corinthians 9:27  But I discipline my body and ykeep it under control,2 lest after preaching to others zI myself should be adisqualified.

Don't Put All of Your Eggs Into One Basket 05.01.2024

Ecclesiastes 11:2 “Divide your portion to seven, or even to eight, for you do not know what misfortune may occur on the earth.”

ABIDE - FAITH, HOPE, & LOVE 29.12.2023

1 Cor 13:13 Three things will last forever—faith, hope, and love—and the greatest of these is love.

Living the Giving Life 22.12.2023

Proverbs 19:6 Many will seek the favor of a generous person, And every person is a friend to him who gives gifts.

Developing A Quality Temperament 15.12.2023

Proverbs, chapter 23:7 "As a man thinketh in his heart, so is he". Temperament refers to personality traits that determine how someone reacts to the world.

The Key To Contentment 08.12.2023

Philippians 4:11-13 11 I am not saying this because I am in need, for I have learned to be CONTENT whatever the circumstances. 12 I know what it is to be in need, and I know what it is to have plenty. I have learned the secret of being content in any and every situation, whether well fed or hungry, whether living in plenty or in want. 13 I can do all this through him who gives me strength. • def:...

Fear is Dangerous 01.12.2023

2 Timothy 1:7 For God hath not given us the spirit of fear; but of power, and of love, and of a sound mind.

Refining Your Self Concept 24.11.2023

2 Cor 5:17 Therefore if any man  be  in Christ,  he is  a new creature: old things are passed away; behold, all things are become new.

WHY THEY JUMP 17.11.2023

"Why many high achievers eventually self sabotage"

Doing the Work that Matters 11.11.2023

Doing the work thar matters before walking out a calling:   1. Ridding oneself of EGO 2. Developing an orientation of servitude 3. Preparing your soul for war 4. Dirty work of deliverance 5.Strengthening your relationships (marriage) 6. Refining your orientation : CHRIST IS LIFE 7. Entering His rest before you work: eliminating the rat race / losing anxiety 8. Developing a winning routine (Rhythm)...

Falling In Love Again - Mark & Lisa Jones 11.11.2023

Marriage conference w/ Mark & Lisa Jones

BETTER! 10.11.2023

"Cultivating a drive to constantly offer an improving version of yourself" Philippians 3:12 Brethren, I do not count myself to have apprehended; but one thing I do, forgetting those things which are behind and reaching forward to those things which are ahead, I press toward the goal for the prize of the upward call of God in Christ Jesus.   LIFE IS NOT GOING TO GET EASIER, YOU HAVE TO GE...

Social Skills for Effective Leadership 04.11.2023

Critical SOCIAL SKILLS for Effective Leadership James 1:19 AMP Understand this, my beloved brothers and sisters. Let everyone be quick to hear [be a careful, thoughtful listener], slow to speak [a speaker of carefully chosen words and], slow to anger [patient, reflective, forgiving];     Ephesians 4:32 KJV And be ye kind one to another, tenderhearted, forgiving one another, even as God for Christ&...

CONFRONTATION - a social skill 03.11.2023

Matt 18:15 “If another believer sins against you, go privately and point out the offense. If the other person listens and confesses it, you have won that person back.

PURSUIT 29.10.2023

Matthew 6:33 But seek first his kingdom and his righteousness, and all these things will be given to you as well.

Flowers From the Graveyard - Recognizing Relational Exploitation 27.10.2023

2 Cor 11:26 In journeyings often, in perils of waters, in perils of robbers, in perils by mine own countrymen, in perils by the heathen, in perils in the city, in perils in the wilderness, in perils in the sea, in perils among false brethren; Jude 1:4 For certain men have crept in among you unnoticed—ungodly ones who were designated long ago for condemnation. They turn the grace of our God into a...

GIVE NO ROOM TO THE ENEMY 26.10.2023

Job 1:10   “Have you not put a hedge around him and his household and everything he has? You have blessed the work of his hands, so that his flocks and herds are spread throughout the land.

What To Do When They Are Telling Lies On You 20.10.2023

Gal 5:16 This I say then, Walk in the Spirit, and ye shall not fulfil the lust of the flesh.

The Juggler 13.10.2023

2 Corinthians 11:26-28 26  I have been constantly on the move. I have been in danger from rivers, in danger from bandits, in danger from my fellow Jews, in danger from Gentiles; in danger in the city, in danger in the country, in danger at sea; and in danger from false believers.  27  I have labored and toiled and have often gone without sleep; I have known hunger and thirst and have often gone wi...

Listen to the Live Long Lead Well podcast in Replaio

Radio and podcasts in one app - free, with no sign-up. Install today and do not miss the launch

Get it on Google Play

Replaio is not a podcast publisher; show names, artwork and audio belong to their authors and are distributed through public RSS feeds.