www.enr.com

ENR Critical Path Podcast

Business EN ↓ 145 episodes

ENR’s Critical Path Podcast delivers insights from leading industry experts and decision-makers about the latest construction industry innovations, issues and developments.

Be sure to visit the podcast's website and support the creator: www.enr.com

Author

www.enr.com

Category

Business

Podcast website

www.enr.com

Latest episode

Nov 20, 2026

Where to listen?

Podcasts in the app Replaio Radio Coming soon

Podcasts are coming to the app soon. Install now and be the first to see a whole new take on podcasts

Get it on Google Play Install for free Android 10M+ downloads · 4.7+ rating iOS soon

Episodes

Erin Brenneman on Pursuing an Engineering Career 20.10.2023

ENR editors Aileen Cho and Jeff Yoders chat with an up-and-coming engineer currently garnering bridge experience with Modjeski and Masters.

Peter Gertler on the “inflection point” for rail and transit 29.09.2023

ENR Editors Aileen Cho and Jeff Yoders talk to HNTB’s senior vice president about the renaissance of rail travel—and the project delivery challenges that come with it.

Building a transformative $1.5B airport terminal in Kansas City 21.09.2023

ENR Editors Aileen Cho and Jeff Yoders chat with Mark Goodwin, Geoff Stricker and Justin Meyer (pictured) about how a vital project got built on time and budget while exceeding diversity goals.

A Special Roving Podcast at FutureTech ‘23 31.08.2023

ENR Editors Aileen Cho and Jeff Yoders interviewed attendees of ENR’s FutureTech, including Lisa Kelly of EarthCam, during a lively cocktail hour.

Eric Keen on the past, present and future of transportation 15.08.2023

ENR Transportation Editor Aileen Cho talks (and reminisces) with the CEO of HDR, a longtime transportation leader, about the industry and the company's vision moving forward.

Chatting With a Caltrans Couple 25.07.2023

ENR Transportation Editor Aileen Cho interviews Marco and Christina Ruano about their courtship, construction, claims and other Caltrans adventures.

Ingrid Merriwether on “insuring” success for diverse contractors 12.07.2023

Aileen Cho and Jeff Yoders interview the president of an insurance brokerage about fostering success for both major agencies and small contractors.

A Special Roving Podcast from AOE 2023 27.06.2023

ENR editors Aileen Cho and Jeff Yoders roamed the Edison Ballroom for the second annual Newsmakers/Best of the Best roving podcast with honorees past and present, such as Sam Hassoun.

Oracle's Mark Webster Talks Security, Construction Tech 07.06.2023

Mark Webster, senior vice president and general manager of Oracle Construction, talks to Aileen Cho and Jeff Yoders about security certifications such as FedRAMP, the history of Primavera P6 and artificial intelligence for construction.

Kumar Parakala Talks Digital Innovation 23.05.2023

Kumar Parakala, president of GHD Digital, talks to ENR Editors Aileen Cho and Jeff Yoders about how contractors and design firms can advance technologically to improve their success in an increasingly digital world. As architects and engineers return to the office post-COVID, digital transformation is a must, not an option.

Passing the Education Design Baton at QKA 09.05.2023

Mark Quattrocchi started Quattrocchi Kwok Architects in a spare bedroom after graduating from Berkeley. The firm has grown to become a leader in K-12 education design and Quattrocchi’s mentee, Aaron Jobson, was recently named president and CEO of the company. Quattrocchi and Jobson discuss how the education market is changing, the needs of modern school districts, and how to plan for an architectu...

Rene Morkos on “construction optioneering” 21.04.2023

The founder of ALICE Technologies talks with ENR Editors Aileen Cho and Jeff Yoders about optimizing project schedules, tough love from Stanford professors and his experience with construction around the world.

LIFTbuild’s Joe Benvenuto Talks Exchange, Top-Down Construction 04.04.2023

With the delivery of Exchange, a $64.6-million residential project in downtown Detroit, LIFTbuild has demonstrated the viability of its top-down construction approach. LIFTbuild Chief Operating Officer Joe Benvenuto talks with Jeff Yoders and Aileen Cho about strand jacks, the 15 different patents for top-down construction and manufacturing-in-construction processes that LIFTbuild holds and what c...

Arup’s Experts Talk EV Transition 06.03.2023

Arup Senior Geospatial Analyst Samantha Lustado and Associate Principal and Americas East Transportation Decarbonization Leader Kate Fichter discuss the many issues surrounding infrastructure and the transition to electric vehicles such as the various community needs for charging in places as far flung as Los Angeles and Pittsburgh, range anxiety , electrical generation and transmission and even t...

Scott Hendrickson Helps Burns & McDonnell Embrace New Technologies 10.02.2023

Embracing robotics, new energy generation and delivery technologies and design innovation is all in a day’s work for Scott Hendrickson, director of construction technology and innovation at Burns & McDonnell in Kansas City.

Roving Podcast at Transportation Research Board 06.02.2023

Senior Transportation Editor Aileen Cho talked to WsDOT secretary Roger Millar and three of his peers at TRB.

Tina Millan on the evolution of aviation 26.01.2023

The TRC aviation director talks about the intersection with energy, and mentoring other women.

Tracking Progress With Buildots Co-Founder Aviv Leibovici 26.01.2023

ENR Associate Technology Editor Jeff Yoders talks to Buildots Co-Founder and Chief Product Officer Aviv Leibovici about artificial intelligence in construction, the startup environment in 2023 and even his time in the Israeli Defense Force’s prestigious Talpiot program.

Greg and Keith Bentley on the Future of Digital Twins and Project Data 13.01.2023

ENR’s Deputy Editor for News & Technology Jeff Rubenstone talks to Bentley System’s CEO Greg Bentley and CTO Keith Bentley about new developments in the software giant’s digital twin platforms.

The Rev. Larry Bullock on the state of diversity and inclusion in construction 14.12.2022

ENR editors Aileen Cho and Emell Adolphus chat with the leader of the US Minority Contractors Association.

VHB’s Carol Lurie on the evolution of sustainable airports 06.12.2022

ENR Senior Transportation Editor Aileen Cho takes a catchup flight with a longtime aviation friend.

Wanda Martinez on the journey of transforming a W/MBE into a prime contractor 18.10.2022

ENR Editor Aileen Cho talks with a construction veteran about her experiences as a woman, a Latinx and a small business owner.

Sam Hassoun on Eliminating Disputes in Construction Projects 21.09.2022

Aileen Cho and Jeff Yoders talk to a 2019 ENR Newsmaker about being an ambassador for the industry – and the holy grail of not just resolving, but eliminating project claims and disputes.

Roz Buick Prepares Oracle for the Data Revelation 19.09.2022

Rosalind “Roz” Buick, senior vice president of construction and engineering strategy at Oracle, talks with Jeff Yoders and Aileen Cho about how better project data is changing how contractors perform their work and how the data revolution she’s been a witness and an advocate for has changed other industries in her 25 years in the technology sector. Roz also talks about growing up in her native New...

2022 FutureTech Conference 08.09.2022

In another special roving podcast, ENR editors Aileen Cho and Jeff Yoders talked to attendees of the 2022 FutureTech conference in San Francisco, including FHWA senior construction engineer David Unkefer.

Listen to the ENR Critical Path Podcast podcast in Replaio

Radio and podcasts in one app - free, with no sign-up. Install today and do not miss the launch

Get it on Google Play

Replaio is not a podcast publisher; show names, artwork and audio belong to their authors and are distributed through public RSS feeds.